Construction QA & handovers

Pin the defect. Verify the fix. Skip the extra trip.

During quality checks, handovers and warranty inspections, defects are pinned directly in the 3D model. Contractors report the fix with a photo or short scan, and you verify it from the office.

Where it hurts today

01

Follow-ups on site

Someone drives out again just to find that something is still not right.

02

Defects without a location

Defect lists with photos rarely show exactly where something needs fixing.

03

Existing buildings are tedious

In existing buildings, area takeoffs and documenting new conditions take time, especially in furnished rooms.

The biggest effort is in the feedback on defect remediation. Often someone has to go back on site just to find that something is still not right.
From conversations with construction QA leads

How it works with INSINIK

Capture. Coordinate. Guide.

  1. 1

    Capture the walkthrough

    A 3D model of the room is created during the inspection.

  2. 2

    Pin the defects

    Defects are marked in the model and handed on as tasks.

  3. 3

    Report the fix

    The contractor confirms with a photo or short scan at the same spot.

  4. 4

    Accept remotely

    You check in the model and only go on site when it is really needed.

Use cases

  • Quality checks during construction
  • Handovers and acceptance
  • Defect management and remediation feedback
  • Warranty inspections and follow-ups
  • Documenting existing buildings

Who it is for

Site managementOwner’s representativeQuality assurance / PQMProject management

Pilot

A pilot in your industry

Clearly scoped, 4 to 6 weeks, with KPIs we define together such as second visits, trips, expert hours and follow-up questions.

Typical scope

One project, one handover phase, a small team.

4–6weeks
Second visitsTripsExpert hoursFollow-up questions