BIM2Field & as-built capture

What was planned. What was built. At a glance.

INSINIK captures as-built conditions with a smartphone as a spatial model, measures when needed and puts plan and execution side by side. A fast complement to your existing surveying and BIM workflows.

Where it hurts today

01

As-built data ages quickly

A lot changes on site between two surveys. Documentation lags behind.

02

Comparison is costly

Comparing plan and execution takes special equipment, specialists and time.

03

The model never reaches the site

What lives in the BIM model often arrives on site as a PDF or printout.

In context

INSINIK does not replace total stations or laser scanners. It complements them wherever fast spatial documentation is enough and capture should happen more often.

How it works with INSINIK

Capture. Coordinate. Guide.

  1. 1

    BIM to the field

    Relevant elements and checkpoints from the design are prepared.

  2. 2

    Capture by smartphone

    Site management or surveying captures the as-built state, measured if needed.

  3. 3

    Compare plan and execution

    Deviations become visible and can be located in the model.

  4. 4

    Document & feed back

    Results flow back into the project, traceable and dated.

Use cases

  • As-built documentation
  • Construction progress tracking
  • Plan vs. execution comparison
  • Quick measurements by smartphone
  • Coordination with BIM models

Who it is for

BIM managersHead of technical officeSite managementSurveying

Pilot

A pilot in your industry

Clearly scoped, 4 to 6 weeks, with KPIs we define together such as second visits, trips, expert hours and follow-up questions.

Typical scope

One construction section, one documentation process.

4–6weeks
Second visitsTripsExpert hoursFollow-up questions